1. Home > 
  2. Stock Photos > 
  3. Heavy-lift crane lifting platform for NASA’s Space Launch System at Kennedy Space Center

Heavy-lift crane lifting platform for NASA’s Space Launch System at Kennedy Space Center Image

Heavy-lift crane lifting platform for NASA’s Space Launch System at Kennedy Space Center

Heavy-lift crane is lifting the C-level work platform for installation in High Bay 3 of the Vehicle Assembly Building at NASA's Kennedy Space Center. The advanced engineering and ground system operations are featured prominently, showcasing NASA's preparations for the Space Launch System (SLS) rocket and the Orion spacecraft. This imagery is useful for showcasing engineering marvels, construction technology, space missions, and the continuation of NASA’s journey to Mars.

Credit Photo

If you would like to credit the Photo, here are some ways you can do so

CC0 (Creative Commons Zero)

Editorial Use only - Please be aware that images marked as Editorial cannot be used for commercial, promotional, advertorial or endorsement purposes. You should only use Editorial images in connection with events that are newsworthy or of (non commercial) general interest.

Similar Free Stock Images

Apollo 10 Spacecraft on Launch Pad at Kennedy Space Center
Astronauts Repairing Hubble Space Telescope During Spacewalk
Historic Mercury-Atlas 6 Launch, 1962, Space Exploration
Orbital Maneuvering System Pod Removal from Shuttle Endeavour in NASA's Processing Facility
Space Shuttle on Launchpad Ready for Takeoff at Night
Aerial View of Mobile Launcher Platform at Kennedy Space Center, NASA Facility
Mars Exploration Rover Spirit Launches from Cape Canaveral
NASA Engineers Install Heavy Lift Rocket Test Hardware at Marshall Space Flight Center
Space Shuttle Atlantis Launch from Kennedy Space Center, May 1989
Heavy-lift Crane Raising Platform for NASA's SLS in Kennedy Space Center VAB
Space Shuttle Columbia Liftoff on Mission STS-80
Delta II Rocket Ready for Launch at Night
Saturn I Rocket Engines Test Firing at Marshall Space Flight Center
Crane Lifting Work Platform in NASA's Vehicle Assembly Building
Delta II Heavy rocket second stage preparation for infrared telescope launch
Sunset over Ares I-X Rocket at Launch Pad 39B, Kennedy Space Center
Cosmonaut and Astronaut Descending Steps Baikonur Cosmodrome Kazakhstan
Technicians prepare Mars Science Laboratory aeroshell for testing at NASA's Kennedy Space Center
Tropical Storm Leslie Captured from ISS Cupola on September 9, 2012
Soyuz TMA-1 Launches from Baikonur Cosmodrome to ISS
Delta II Rocket Launches STSS Demonstrator at Cape Canaveral Air Force Station
Technicians installing solid rocket motor on United Launch Alliance Delta II rocket
Orbiter Columbia on Boeing 747 in Hangar at Palmdale Assembly Facility
Ares I-X Booster Segment Assembly at Kennedy Space Center
Industrial Factory Structure with Steel Framework
Processing Ares I-X Segment at NASA's Kennedy Space Center
Space Shuttle Endeavour Preparing for Transition and Retirement at Kennedy Space Center
NASA Heavy-Lift Crane Installing D-Level Work Platforms for SLS Rocket at Kennedy Space Center
Delta II Heavy Launch Vehicle at Space Launch Complex 17B Ready for Mars Rover Mission
Launch Pad 39B at Daybreak Featuring Ares I-X Rocket
Russian Technician Prepares Soyuz TMA-6 Spacecraft at Baikonur Cosmodrome
Technicians Working on Ares I-X Module Installation at NASA Kennedy Space Center
Atlas V Rocket Launching from Cape Canaveral with TDRS-M Satellite
Aquarius SAC-D Encapsulation in Delta II Fairing for Launch Preparation
Sunset at NASA's Launch Pad 39B with Ares I-X Rocket
Astronaut Steven L. Smith Working on Hubble Space Telescope in Extravehicular Activity
Technicians Lowering Descent Stage Over Mars Curiosity Rover for Integration
Crane Lifting B-Level Work Platforms at NASA Kennedy Space Center
NASA J-2X Rocket Engine Powerpack Assembly Test at Stennis Space Center, July 24, 2012
NASA Engineers Working on Space Shuttle Endeavour in Orbiter Processing Facility
Soyuz TMA-16M Spacecraft on Launch Pad at Baikonur Cosmodrome, 2015
Astronaut Anchored to Robot Arm Performing Spacewalk Near Space Shuttle Discovery
Atlas V Rocket at Sunrise Ready for Launch, Cape Canaveral Space Complex
Media Awaits Nighttime Rollout of Ares I-X at Kennedy Space Center
Technicians Installing Space Shuttle Endeavour's OMS Pod in Processing Facility
Technicians Preparing Delta II Rocket Stage at Kennedy Space Center
Engineers Preparing Delta IV Rocket Second Stage at Cape Canaveral
Space Shuttle Discovery Transport at Kennedy Space Center
Orbiter Processing Facility with Space Shuttle Discovery During Transition
Construction Cranes Against Dark Sky Over High-Rise Building
NASA Ares I-X Test Rocket Launches from Kennedy Space Center
NASA workers preparing STEREO spacecraft for launch integration
Closely Safed Space Shuttle Endeavour Inside Orbiter Processing Facility
NASA Engineers Prepare Ares I-X Motor Segment in Kennedy Space Center
Installation of Work Platforms in Vehicle Assembly Building at NASA Kennedy Space Center
Workmen Positioning Nose Cone for Apollo 5 Lunar Module at Kennedy Space Center
Space Shuttle Atlantis Launching STS-45 Mission in 1992
Discovery Shuttle Entering Vehicle Assembly Building at Kennedy Space Center
Space Shuttle Discovery Prepared for Launch at Cape Canaveral
Ares I-X Forward Assembly in NASA Vehicle Assembly Building
Engineers Installing Test Hardware on Space Launch System Core Stage
Atlas V Rocket First Stage Ready for NASA's Mars Science Laboratory Mission
Engine Installation on S-IB Stage at Michoud Assembly Facility
Technicians Preparing Space Shuttle Enterprise for Display at Intrepid Museum in New York
Ares I-X Test Rocket Launches from Kennedy Space Center, October 28, 2009
S-IVB-505 and S-IVB-211 Rockets in Spacecraft Assembly Tower
Dawn at NASA's Kennedy Space Center with New Lightning Towers
Nighttime Industry Complex with Illuminated Storehouses
Ares I-X Forward Center Segment Arrives at Vehicle Assembly Building
Saturn V Ground Test Booster Installation at Marshall Space Flight Center
Space Shuttle Atlantis Launching from Kennedy Space Center in Cape Canaveral
Boeing Delta II Rocket Ready for Mars Exploration Rover Launch
Construction of Mobile Launcher for Constellation Program at Kennedy Space Center
Heavy Duty Crane Lifting Materials in Industrial Warehouse
Industrial Factory with Digital Interface Icons for Data Processing Concept
Construction Workers Installing Stabilizing Arm at NASA Launch Pad 39B
NASA's GRAIL Mission Liftoff from Cape Canaveral
Ares I-X Rocket Lifts Off from Kennedy Space Center in Dramatic Launch
Space Shuttle Endeavour Launching from Kennedy Space Center for Final Mission
Space Shuttle Endeavour Rollout for STS-130 Mission at Night
NASA J-2X Rocket Engine Test at Stennis Space Center after Hurricane Isaac
Ares I-X Rocket at Launch Pad 39B at Sunset in Cape Canaveral
Crane Lifting Ares I-X Super Stack 3 in NASA Vehicle Assembly Building
Technicians Preparing Space Shuttle Endeavour for Public Display
F-1 Engine Test Firing at Marshall Space Flight Center
Atlas V Rocket with TDRS-K Satellite on Launch Pad at Cape Canaveral Air Force Station
Atlas V Rocket Launch with NASA's TDRS-M Satellite at Cape Canaveral
Saturn I/IB Rocket Test Launches at Marshall Space Flight Center in 1960s
Technicians Preparing Deep Space 1 on Launch Pad at Cape Canaveral Air Station
Historic Saturn V F-1 Engines Test at Marshall Space Flight Center
Lift-off of Atlas V LDCM Rocket from Vandenberg AFB, California
Mars Science Laboratory Rover Curiosity Processing at NASA Kennedy Space Center
NASA Technicians Stacking Ares I-X Upper Stage Simulator Segments
Heavy-Lift Crane Installing C-Level Work Platforms at NASA's Kennedy Space Center
Installation of D-Level Platforms for NASA’s Space Launch System in Kennedy Space Center
Birdcage Framework Placed on Ares I-X Simulator CM-LAS
Ares I-X Rocket on Launch Pad at NASA's Kennedy Space Center in Florida
Space Shuttle Enterprise Flying Over New York City, April 27, 2012
Industrial Overhead Crane in Dimly Lit Workshop
Industrial Warehouse with Data Overlay Illustrating Growth