1. Home > 
  2. Stock Photos > 
  3. Technicians Working on Ares I-X Module Installation at NASA Kennedy Space Center

Technicians Working on Ares I-X Module Installation at NASA Kennedy Space Center Image

Technicians Working on Ares I-X Module Installation at NASA Kennedy Space Center

Technicians in NASA's Kennedy Space Center are maneuvering a crane to lift and install a roll control system module for the Ares I-X rocket. This detailed work is part of the Constellation Program aimed at sending men to the moon and beyond. Useful for content on space exploration, aerospace engineering, rocket assembly, teamwork in technical fields, and NASA missions.

Powered by Adobe logo
Missioni spaziali centro di controllo missione della Nasa. John F. Kennedy Space Center. Conto alla rovescia e schermi collegati alla piattaforma di lancio. Florida, Usa - Powered by Adobe

Credit Photo

If you would like to credit the Photo, here are some ways you can do so

CC0 (Creative Commons Zero)

Editorial Use only - Please be aware that images marked as Editorial cannot be used for commercial, promotional, advertorial or endorsement purposes. You should only use Editorial images in connection with events that are newsworthy or of (non commercial) general interest.

Similar Free Stock Images

Processing Ares I-X Segment at NASA's Kennedy Space Center
NASA Heavy-Lift Crane Installing D-Level Work Platforms for SLS Rocket at Kennedy Space Center
Aerial View of Mobile Launcher Platform at Kennedy Space Center, NASA Facility
NASA J-2X Rocket Engine Test at Stennis Space Center after Hurricane Isaac
Technicians Preparing Space Shuttle Endeavour for Public Display
Engineers Installing Test Hardware on Space Launch System Core Stage
Technicians Preparing Atlas V Payload Fairing for Mars Science Laboratory Mission
Technicians Work on NASA's X-37 Prototype at Boeing's Huntington Beach Facility
Engineers Preparing MESSENGER Spacecraft for Launch
NASA J-2X Rocket Engine Powerpack Assembly Test at Stennis Space Center, July 24, 2012
NASA's GOES-P Meteorological Satellite Being Unloaded at Astrotech Facility
Soyuz TMA-16M Spacecraft on Launch Pad at Baikonur Cosmodrome, 2015
Technician Prepares Pegasus XL Rocket Second Stage at Vandenberg Air Force Base
Workers preparing Inertial Upper Stage booster in Vertical Processing Facility
Astronauts Preparing for Underwater Training in Neutral Buoyancy Lab
Ares I-X Forward Center Segment Arrives at Vehicle Assembly Building
Scientists Deploy Sensor-Laden Buoy onto Research Vessel in Woods Hole
Installation of D-Level Platforms for NASA’s Space Launch System in Kennedy Space Center
NASA Engineer Conducting Final Inspections at Goddard Space Flight Center
NASA Technicians Rotating Rover Curiosity for Mars Science Laboratory Mission
Technicians Preparing AIM Spacecraft for Testing and Flight Simulation
Inside View of Wind Turbine Tower with Ladder and Maintenance Elevator
Construction Workers Installing Stabilizing Arm at NASA Launch Pad 39B
Orbital Maneuvering System Pod Removal from Shuttle Endeavour in NASA's Processing Facility
Russian Technician Prepares Soyuz TMA-6 Spacecraft at Baikonur Cosmodrome
NASA Engineers Install Heavy Lift Rocket Test Hardware at Marshall Space Flight Center
Heavy-lift Crane Raising Platform for NASA's SLS in Kennedy Space Center VAB
Atlas V Rocket with TDRS-K Satellite on Launch Pad at Cape Canaveral Air Force Station
Atlas V Rocket First Stage Ready for NASA's Mars Science Laboratory Mission
Crane Lifting B-Level Work Platforms at NASA Kennedy Space Center
NASA Ares I-1 Solid Rocket Booster Testing Facility at Kennedy Space Center
Technicians Preparing Deep Space 1 on Launch Pad at Cape Canaveral Air Station
NASA Engineers Working on Space Shuttle Endeavour in Orbiter Processing Facility
Heavy-lift crane lifting platform for NASA’s Space Launch System at Kennedy Space Center
Cosmonaut and Astronaut Descending Steps Baikonur Cosmodrome Kazakhstan
Preparation of MSL Radioisotope Thermoelectric Generator at Kennedy Space Center
Mars Science Laboratory Rover Curiosity Processing at NASA Kennedy Space Center
Heavy-Lift Crane Installing C-Level Work Platforms at NASA's Kennedy Space Center
Russian Engineers Assembling Zarya Cargo Module for ISS
Astronauts Testing Hubble Repair Equipment During Crew Equipment Test
Birdcage Framework Placed on Ares I-X Simulator CM-LAS
Construction of Mobile Launcher for Constellation Program at Kennedy Space Center
Workers Maintaining Machinery in Industrial Factory
Digital Interface in Industrial Construction Setting
NASA workers preparing STEREO spacecraft for launch integration
Mercury Astronauts Posing at Manned Spacecraft Center in Houston, 1963
Workmen Positioning Nose Cone for Apollo 5 Lunar Module at Kennedy Space Center
Crane Lifting Ares I-X Super Stack 3 in NASA Vehicle Assembly Building
Engineers Attaching Escape Tower to Soyuz TMA-09M at Baikonur Cosmodrome, 2013
Delta II Rocket Ready for Launch at Night
Lifting NASA's GOES-P Satellite at Astrotech Space Operations Facility
Engine Installation on S-IB Stage at Michoud Assembly Facility
Centaur Stage Arrival for TDRS-K Preparation at Port Canaveral
Delta II Heavy rocket second stage preparation for infrared telescope launch
Astronauts Training for Hubble Space Telescope Maintenance in Neutral Buoyancy Simulator
Ares I-X Rocket on Launch Pad 39B Awaiting Flight Test at Kennedy Space Center
Astronauts Training for Hubble Repair Mission in Underwater Facility
Mars Exploration Rover Cruise Stage with Solar Panels in Testing Phase
Technicians prepare Mars Science Laboratory aeroshell for testing at NASA's Kennedy Space Center
Engineer Preparing SPURS Buoy for Ocean Deployment at Woods Hole, 2012
NASA's Mars Science Laboratory Curiosity Rover and Descent Stage Integration
Technicians Installing Heat Shield on Shuttle Endeavour Engine at Kennedy Space Center
Technicians installing solid rocket motor on United Launch Alliance Delta II rocket
Technicians Inspecting Mars Science Laboratory Aeroshell at NASA Facility
Confident Engineer in Protective Gear in Industrial Workshop
Technician Ascending Turbine Stairs with Holographic Data Screens
NASA Mars Science Laboratory Payload Fairing at Kennedy Space Center
Installation of Work Platforms in Vehicle Assembly Building at NASA Kennedy Space Center
Final Interior View of Space Shuttle Endeavour Before Closing Airlock, Cape Canaveral
Aquarius SAC-D Encapsulation in Delta II Fairing for Launch Preparation
Ares I-X Forward Assembly in NASA Vehicle Assembly Building
Technicians Lowering Descent Stage Over Mars Curiosity Rover for Integration
Technicians Assembling Centaur Upper Stage at Cape Canaveral
Crane Lifting Work Platform in NASA's Vehicle Assembly Building
Technicians Installing Heat Shield On Space Shuttle Endeavour
Workers Assembling Mars Exploration Rover at NASA Kennedy Space Center
Technicians Preparing NASA Aquarius Satellite for Final Testing at Vandenberg AFB
Technicians Preparing Aquarius/SAC-D Spacecraft for Testing at Vandenberg Air Force Base
Scientists Testing Environmental Control and Life Support Systems for International Space Station
Technicians Lifting AIM Spacecraft for Integrated Testing at Vandenberg Air Force Base
NASA Technicians Stacking Ares I-X Upper Stage Simulator Segments
NASA Mars Science Laboratory Aeroshell in Processing Facility
Technicians Installing Space Shuttle Endeavour's OMS Pod in Processing Facility
Technicians Preparing Delta II Rocket Stage at Kennedy Space Center
Solid Rocket Booster Being Prepared for Mars Rover Launch at Kennedy Space Center
Orbiter Processing Facility with Space Shuttle Discovery During Transition
Engineer Operating Hoist Machine in Industrial Workshop
Technicians Inspecting Aircraft with Holographic Data Overlay